ZURILABS
Request a demo
ZURI EAM

Know every valve, every service, every crew.

Enterprise Asset Management for valves, gearboxes and the field teams who look after them. One register, live service status, planned work and dispatch.

Dashboard
DDemo Admin
Fleet health
2,840 valves and gearboxes on the register
ManagementEngineeringOperations
All departments  ▾All areas  ▾All valve types  ▾
As at 12 Oct 2026 · refreshed on openingClassic dashboardPrintExport
Valves on register
2,840
BV 2,650 · SV 172 · other 18
Serviced in the last 12 months
412
14% of the register
Past their service date
1,673
59% · against each valve's own frequency
Never serviced
28
no service on record
Gearboxes encapsulated
1,240
44% · 1,580 still to do
Service status of the fleeteach valve is measured against its own maintenance frequency
1,021
468
540
665
On schedule 1,021 · 36%Due within 90 days 118 · 4%Overdue under 1 year 468 · 16%Overdue 1 to 2 years 540 · 19%
Overdue over 2 years 665 · 23%Never serviced 28 · 1%
By areashare of valves: on schedule · overdue · never serviced
AREAVALVESOVERDUE
NORTH702
190
506
72%
WEST655
250
399
61%
CENTRAL590
225
359
61%
EAST540
200
335
62%
RESERVOIR281
215
63
22%
BOOSTER72
59
11
15%
Maintenance frequency behind these figuresa valve with none recorded is counted as 1 year
2,690
■ 1 year 2,690 · 95%■ 2 years 74 · 3%■ 3 years 70 · 2%■ Not recorded 6 · 0%
6 valves have no maintenance frequency
Counted as 1 year in the status above. Once a frequency is set, its status is exact.
Open them →
59% of valves are past their service date
1,673 valves are set to a 1-year frequency. If that is a default rather than the agreed term, the backlog is overstated. Worth confirming first.
Check maintenance frequency →
Reservoir is furthest ahead
215 of its 281 valves (77%) are on schedule, against 36% across the other areas. 74 were serviced in the last 12 months.
Open the 281 reservoir valves →
No delivered service since 02 Sep 2026
14 services are completed and published but not yet delivered, 11 of them from Aug 2026.
See the 14 →
When each valve was last servicedvalves per quarter of last service
15171921232526
Services done each year6,050 records of these valves, by type
140
16
380
17
30
18
760
19
450
20
820
21
1,100
22
300
23
1,020
24
640
25
410
26
■ Inspection■ Refurbishment■ Replacement■ Other
PAST SERVICE DATE
1,673 valves
59% of the register, measured against each valve’s own frequency
71204419New
Gearbox encapsulation, Northgate Rd LP 22
Due 30 Nov 2026 · Medium priority
✓
Team 2 ready to dispatch
Available and certified
ZURI EAM
AT A GLANCE
11 registerValves and gearboxes
2Live statusVs each asset’s frequency
35 viewsDashboard to dispatch
4100% auditedEvery change logged
TAKE A TOUR

Five screens. One connected picture.

Dashboard
DDemo Admin
Fleet health
2,840 valves and gearboxes on the register
ManagementEngineeringOperations
All departments  ▾All areas  ▾All valve types  ▾
As at 12 Oct 2026 · refreshed on openingClassic dashboardPrintExport
Valves on register
2,840
BV 2,650 · SV 172 · other 18
Serviced in the last 12 months
412
14% of the register
Past their service date
1,673
59% · against each valve's own frequency
Never serviced
28
no service on record
Gearboxes encapsulated
1,240
44% · 1,580 still to do
Service status of the fleeteach valve is measured against its own maintenance frequency
1,021
468
540
665
On schedule 1,021 · 36%Due within 90 days 118 · 4%Overdue under 1 year 468 · 16%Overdue 1 to 2 years 540 · 19%
Overdue over 2 years 665 · 23%Never serviced 28 · 1%
By areashare of valves: on schedule · overdue · never serviced
AREAVALVESOVERDUE
NORTH702
190
506
72%
WEST655
250
399
61%
CENTRAL590
225
359
61%
EAST540
200
335
62%
RESERVOIR281
215
63
22%
BOOSTER72
59
11
15%
Maintenance frequency behind these figuresa valve with none recorded is counted as 1 year
2,690
■ 1 year 2,690 · 95%■ 2 years 74 · 3%■ 3 years 70 · 2%■ Not recorded 6 · 0%
6 valves have no maintenance frequency
Counted as 1 year in the status above. Once a frequency is set, its status is exact.
Open them →
59% of valves are past their service date
1,673 valves are set to a 1-year frequency. If that is a default rather than the agreed term, the backlog is overstated. Worth confirming first.
Check maintenance frequency →
Reservoir is furthest ahead
215 of its 281 valves (77%) are on schedule, against 36% across the other areas. 74 were serviced in the last 12 months.
Open the 281 reservoir valves →
No delivered service since 02 Sep 2026
14 services are completed and published but not yet delivered, 11 of them from Aug 2026.
See the 14 →
When each valve was last servicedvalves per quarter of last service
15171921232526
Services done each year6,050 records of these valves, by type
140
16
380
17
30
18
760
19
450
20
820
21
1,100
22
300
23
1,020
24
640
25
410
26
■ Inspection■ Refurbishment■ Replacement■ Other
123
Asset Detail
←
V41-7  Not Encapsulated
KINGSWAY AVE LP 114 · NORTH
🔒 Active ▾
Locked — this asset can’t be edited. Unlock it with a reason to make a change; every change made after that is recorded in Audit.Unlock
BV
DetailsValve SpecificationMaterial of ConstructionGearBox SpecificationDimensionsSummaryMaintenance History1Audit
IDENTITY & REFERENCE
Tag no (client)
V41-7
Asset ID
V41-7
Registry no
—
Job / report no
JR204471
Date
14/03/2017
RFID
—
Status
Active
LOCATION
Department
NETWORK NORTH
Sub department
NN
Department area
NORTH
Location
KINGSWAY AVE LP 114
Landmark
—
GPS co-ordinate
—   /   —
Address
—
CLIENT & CONTACT
Client name
MERIDIAN UTILITIES BOARD
Contact person
Ms Alicia Verran
Contact no
5550 0142
Maintenance frequency
1 Year
Area
—
Contact email
—
Next maintenance date
14-03-2019
ASSET IMAGE
Photo
123
Service Detail
←
SR250114-1  ENC
V9 · 06/03/2026 · MERIDIAN UTILITIES BOARD · NORTH
WebCOMPLETED✓ Published ▾Report
SVBVPRVNRV
DetailsValve SpecificationMaterial of ConstructionGearBox SpecificationDimensionMaintenance20SummaryAudit
⌄ OBSERVATION ON ARRIVAL 3
#CONDITIONRESULTNOTES
1Gearbox external body and components with no external physical damage.PassPaint intact
2No visible damage, corrosion or rust.Pass—
3Valve in OPEN position.PassConfirmed on site
⌄ WORK DONE 2
#WORK ITEMRESULTNOTES
1Markings made on gearbox. Mounting, last position and orientation recorded before disassembly.DonePhotos attached
2Gearbox encapsulation at site. (Line item 410)DoneSealant batch GB-2209
⌄ FINDING ANALYSIS 1
#FINDINGRESULTNOTES
1Gearbox in good condition.PassNo action needed
⌄ GB EXTERNAL 3
#CONDITIONRESULTNOTES
1Gearbox external body and components with no external damage.Pass—
2No sign of corrosion.Pass—
3Gearbox valve in OPEN position.Pass—
123
Work Order — 71204419
DDemo Admin
←
71204419  New
Northgate Rd LP 22 near Junction 4 · MERIDIAN UTILITIES BOARD
DeleteEditCancel WONew ▾
DetailsAssets1Work Items4Work PlanPTW0Service Reports0ProgressMilestonesTime & Labour0Documents
WORK ORDER REFERENCE
WO number
71204419
Client ref (acct)
MRET-K27LQ
Client
MERIDIAN UTILITIES BOARD
Status
New
Priority
Medium
WORK DETAILS
Work order title
Northgate Rd LP 22 near Junction 4 – gearbox encapsulation
Site location / address
Northgate Rd LP 22 near Junction 4, Along Kingsway Avenue
Purchasing group
TM4-NK
Description
—
DATES & SCHEDULE
WO date (document date)
14/09/2026
Commence date
12/10/2026
Due date (complete on)
30/11/2026
CLIENT DETAILS
Client contract no
8801204
Client contact person
DANIEL OKAFOR
RECORD INFO
Created by
Demo Admin
Created date
08/10/2026 13:40
123
Dispatch
DDemo Admin
Today‹
MON12TUE13WED14THU15FRI16SAT17SUN18
›Monday, 12 Oct 2026CAPACITY90%10.0h used · 86.0h freeTEAMAll Teams ▾
DayWeekMonth
DispatchWOEngineer
Leave & Off
Active Jobs1
71204419 WT-2610-001Team 2
Inspection · 09:00–13:00
◌ Awaiting dispatch
TEAM
08:0009:0010:0011:0012:0013:0014:0015:0016:00
BLOCK PHASES: ▪ Travel (out / back)   ▪ Setup / Dismantle   ▪ Work (start–end)
Team 1
Available
◔ 100% free · 48.0h
Team 2
1 assignment
◔ 38% free · 6.0h
71204419 WT-2610-001
09:00–13:00
Team 3
Available
◔ 100% free · 32.0h
Work Assignment×
✓ All clear to proceed — team available & certified.
WT-2610-001 71204419 · Inspection
Northgate Rd LP 22 near Junction 4, Along Kingsway Avenue
➤ Dispatch to field — team set to go
⊘ Terminate task
12-10-2026   09:00–13:00   Team 2
out 15m · setup 15m · work 4h · dismantle 15m · back 15m
ASSETS
NS180552 · Tag V12 · EASTFIELD RESERVOIR
WORK ITEMS
220 — GB inspection (DOH) 1200–1399mm
TEAM READINESS (2)
ARJUN MENON · Technician
✓ Available✓ No clash⚠ Cert expiring
DANIEL COSTA · Technician
✓ Available✓ No clash✓ Certified
123
Built for field work
Crews see the asset, the job and the checklist in one place, in the office or on site.
Honest numbers
Status is measured against each valve’s own frequency, and data issues are flagged, not hidden.
Traceable by design
Locked records, reasoned unlocks and a full audit trail behind every change.
Ready for your data
We load a sample of your own register so you see it with your assets.
SEE IT ON YOUR ASSETS

See Zuri EAM running
on your own assets.

Book a walkthrough and we will load a sample of your register.